Direct Factory Hotel Door Supply | Room Schedule & Hardware Review
Request Quote

Hotel Guestroom Door — Acoustic Entry Door Set for Hospitality Projects

Composite wood guestroom entry door set with acoustic sealing, electronic lock preparation, closer reinforcement and batch-matched finish control for hotel operators and project contractors.

Guestroom EntryAcoustic Seal OptionElectronic Lock PrepBatch-Matched FinishRoom Schedule Packing
US$148
50–199 sets
US$128
200–499 sets
US$112
≥500 sets
MOQ50 Sets
Lead Time30–45 days after deposit
Configured by project schedule.Final quotation depends on leaf size, core build, frame system, acoustic seal, fire-rated requirement, electronic lock model, closer model and finish batch requirement.
Factory Direct
OEM/ODM Ready
Hardware Review
Export Packing
Download Catalog / Send Room Schedule

Buyer Answer

What should buyers confirm before ordering hotel guestroom doors?

Confirm the room schedule, acoustic target, lock model, closer model, frame depth and finish batch before approval. Guestroom doors are usually supplied as matched sets so corridor noise, hardware preparation and room-by-room packing stay consistent.

Quote-ready details

  • Opening size, wall thickness and room schedule
  • Lock, closer, viewer and indicator drawing
  • Acoustic requirement, fire rating and finish batch
  • Quantity, packing marks and destination port

Guestroom door packages built around room schedules and corridor consistency.

Hotel guestroom doors are specified differently from ordinary interior doors. They face the public corridor, carry heavier hardware, affect acoustic comfort and must remain visually consistent across many openings. Visfurn reviews the leaf, frame, architrave, seal, electronic lock preparation and finish batch as one project package.

The door set can be prepared for electronic locks, viewers, indicators, closers and hinges before finishing. This reduces site cutting, protects finish quality and helps room-by-room installation follow the project schedule.

Hotel guestroom door sets installed along a hospitality corridor

Technical Specifications

Door TypeHotel guestroom composite wood entry door set
CoreEngineered composite core, acoustic or fire-rated build reviewed according to project requirement
Leaf ThicknessTypically 45 mm, with project thickness reviewed by construction and certification need
Frame SystemMatching jamb, architrave and seal package supplied to wall thickness and opening schedule
Hardware PrepElectronic lock, closer, viewer, indicator, hinge and seal preparation by buyer drawing
FinishPVC film, melamine, veneer or painted finish, batch-matched for project rooms

Hardware & Options

Hardware coordination is one of the main reasons hotel operators and contractors choose factory-prepared door sets instead of site-modified slabs.

  • Electronic lock case mortice, cylinder bore and latch face preparation.
  • Closer reinforcement, viewer hole, indicator cut-out and hinge preparation.
  • Perimeter acoustic seal and drop-down bottom seal options.
  • Batch-matched leaf, frame and architrave finish control.
  • Room-numbered packing and floor-by-floor delivery planning.

Applications

Suitable for hotel guestroom entries, serviced apartments, resort guest rooms, student housing, staff dormitories and other hospitality-style room openings requiring consistent finish and prepared hardware.

Hotel guestroom entry door installed at a room entrance

Packaging & Shipping

Each door set can be marked against the room schedule, with leaf, frame, architrave and hardware references packed for efficient distribution on site. Export packaging protects faces, corners and hardware preparation during container loading.

Hotel guestroom doors export packed with room schedule references

Frequently Asked Questions

Why is acoustic sealing important for guestroom doors?

Corridor noise often leaks through the door perimeter. A denser leaf only works when paired with compression seals and a bottom seal, so the door should be quoted as a sealed set.

Can locks and closers be prepared before finishing?

Yes. Send the lock model and closer drawing so mortices, bores and reinforcement can be machined cleanly before finish application.

How do you control finish consistency?

Finish material is reserved from one batch where possible, control samples are retained and doors are produced based on the room schedule.

How should buyers send the enquiry?

Send room schedule, opening size, wall thickness, frame type, hardware models, finish reference, acoustic or fire-rated requirement, quantity and destination.

Get QuoteWhatsApp